Client and Project Location Scope of work Date of award Contract value (Indian Rupees) Date of completion
NTPC Gadarwara Super Thermal Power station 2X800MW , Gadarwara, MP.
Erection Alignment & Welding, Testing, Painting and Handing over of Bunker structure, Raw coal bunkers, Transfer points, trestles and conveyer galleries and misc, Civil Works for unit-1 at 2X800MW, NTPC Gadarwara Super thermal power station.
13-07-2015 11,76,51,858 Completed
NTPC Gadarwara Super Thermal Power station 2X800MW , Gadarwara, MP.
Supply of Materials for the works of MS embedments, Doors, Windows, Glazing, Roofing / Side Cladding, Rain Water Down Take Pipes, Structural Steel Painting, Gratings, Mild Steel Bolts, High Strenth Structural Bolts, PTFE Bearings, MS Hand Railings, Concreting for Bunker Structures, Raw Coal Bunkers, Coal Handling Transfer Points for Unit-1 at 2X800MW NTPC Gadarwara STPP.
13-07-2015 7,43,91,176 Completed
Lanco vidharbha Thermal Power Project 2X660MW (Unit 1&2) at Mandhva Village,Wardha District, Maharashtra.
Erection, Testing, Commissioning of 2X660MW (Unit 1&2) Boiler & Auxiliaries at Lanco vidharbha Thermal Power Project, Mandhva village, wardha dist. Maharashtra.
09-09-2015 71,04,52,710 Completed
Sintex Infra Project Ltd, Unit 1 & 2 of 2x150MW, Waghode, Shindkheda, Maharashtra.
Erection, Testing, Commissioning and handingover of Steam turbine, Turbo Generator, Condenser, TG Integral Piping,HP & LP Heaters, Deaerator, with associated Equipments/Tanks/Vessels, FST & Deaerator, LP Bypass system with associated platform, power cycle pumps & auxiliaries in Unit 1 & 2 of 2x150MW
26-02-2014 5,18,59,128 Completed
Visa Power Limited Unit 1 of 2X600 MW VPL, Deveri & Dumarpali, Raigarh District. Chattisgarh.
Erection, Testing, & Commissioning, Trial Operation and Handing over of Boiler and its Auxiliaries including ESP, Air Preheaters, Ducts and Dampers, Fans, Fuel Piping, Boiler Integral Piping, Power cycle piping, Chemical dozing system, Lining & Insulation, Final painting, etc of Unit 1 of 2 X 600 MW
22.07.2011 617,365,000 Completed
Rattan India Nasik Power Ltd (STG) 5X270MW Nasik, Maharashtra.
Receipt of Materials form BHEL/Storage yard, Handling at stores, site of work, Erection, Testing & commissioning of Steam Turbine and Auxiliaries etc Including bought items of 5x270MW, Nasik Thermal Power Project, Nasik, Maharashtra.
19-02-16 3,97,40,000 Completed
Rattan India Nasik Power Ltd (Boiler, Piping & ESP) 5X270MW Nasik, Maharashtra.
Handling collection of Materials at BHEL/client's storage yard/ stores, Transportation to site Erection, testing & assistance for commissioning, trail operation and handing over of boiler and its auxiliaries, APH, ducts dampers, Fuel piping, boiler integral piping & associated valves, ESP, fans, power cycle piping, Coal mills & coal feeders, insulation ,final painting etc of Unit #4 of 5X270MW Nasik TPS
25-01-16 22,12,95,045 Completed
Gujrat State Electricity Corporation (R&M,ESP)1x210MW Wanakbori, Gujrat
R & M Dismantling of exiting ESP Internal & other components from BHEL/ customer storage to site of work and carring out modification as required Erection, Testing & Commissioning and application of Insulation / Cladding for the work Renovation & Retrofitting of exiting ESP & Ducts for Unit #1 210Mw, Wanakbori, Gujarat.
03-11-16 3,99,00,000 Completed
Lalitpur Thermal Power Station of Lalitpur Power Generation Company Limited 3X600MW, Lalitpur, UP.
Erection, Testing, Commissioning, Trial operation and handing over of steam turbine generator and its auxiliaries & piping etc. for package-B(Unit-2) at 3x660MW, Lalitpur TPS of Lalitpur, UP.
16-12-2013 13,67,49,997 Completed
Lalitpur Thermal Power Station of Lalitpur Power Generation Company Limited 3X600MW, Lalitpur, UP.
Erection, Testing, Commissioning, Trial operation and handing over of steam turbine generator and its auxiliaries & piping etc. for package-B(Unit-2) at 3x660MW, Lalitpur TPS of Lalitpur, UP.
16-12-2013 13,67,49,997 Completed
Maharashtra State Power Generation CoLtd Chandrapur Super Thermal PowerStation Expn Project(2X500 MW),Chandrapur Maharashtra .
Material handling & unloading, Erection, Testing and Commissioning of complete Boiler structures,Pressure parts,ESP,Fans,Power cycle piping,coal mills&feeders insulation & final painting of Unit 9,2x500 MW
23.01.2010 48,94,40,923 Completed
Krishak Bharati Cooperative Limited (KRIBHCO) Project, 1x72MW CPP Revamp KRIBHCO project, Hazira Village, Surat District, Gujarat.
Erection, Testing, Commissioning, Piping and final painting work for 1x72MW unit and Application of Thermal Insulation, Piping and Painting for 1x190 TPH Heat Recovery Generator.
03.10.2012 113,500,000 Completed
NTECL Vallur Thermal Power Project Kuruvimedu Village ponneri Taluk, Tamilnadu.
Erection, Testing, Commissioning & handing over of complete Power Cycle piping supplied under SG&TG packages,Insulation work of Boiler, Esp & Piping, accessories, associated equipment’s/systems, final painting for Phase 2 , Unit-3 1 x 500 MW
21-12-2012 113,500,000 completed
Eleana Power & Infrastructure, 5x270MW, Amravati, Maharashtra.
Erection, Testing, commissioning and Handing over of Ducting, Rotating & Coal Piping of Unit – 5, 5x270MW, Amravati, Maharashtra.
30-10-2014 77,004,997 completed
Eleana Power & Infrastructure, 5x270MW, Amravati, Maharashtra.
Erection, Testing, commissioning and Handing over of Ducting, Rotating & Coal Piping of Unit – 5, 5x270MW, Amravati, Maharashtra.
24-09-2014 90,465,605 completed
Doosan Power Systems India Private Limited,2x685 MW Chhattisgarh Thermal Power Project Near Raikheda Village, Raipur District Chhattisgarh.
Critical Piping Erection, Testing and commissioning of complete and application for Units 1 and 2 of 2x685 MW Set.
23.07.2012 194,757,215 completed
Korba West Power Company Limited, 1X600 MW KWPCL Avanta Raigarh Project, Near Bade Bhandar Village, Raigarh District. Chhattisgarh.
Erection, Testing & Assistance for commissioning, Trial Operation and Handing over of Steam Turbine and Generator Set and its Auxiliaries, HP/LP Heater and Painting, etc., of 1 X 600 MW
06.12.2011 69,400,000 completed
Dainik Bhaskar Power Limited Unit 1 of 2x600 MW DBPL, Janjgir, Champa District. Chhattisgarh.
Erection, Testing, & Commissioning, Trial Operation and Handing over of Boiler and its Auxiliaries including ESP, Air Preheaters, Ducts and Dampers, Fans, Fuel Piping, Boiler Integral Piping, Power cycle piping, Chemical dozing system, Lining & Insulation, Final painting, etc. of Unit 1 of 2 X 600 MW
18.02.2011 571,297,500 completed
NTECL Vallur Thermal Power Project Kuruvimedu Village Ponneri Taluk, Tamilnadu.
Erection, Testing, Commissioning & handing over of complete Power Cycle piping supplied under SG&TG packages, accessories, associated equipment’s/systems, final painting for Unit 1&2 of 2 x 500 MW
15.07.2010 216,864,000 completed
NTECL Vallur Thermal Power Project Kuruvimedu Village Ponneri Taluk, Tamilnadu.
Erection, Testing, and commissioning of complete Boiler Structures, pressure parts, Non-Pressure parts , Rotating Machines including supply and Application of Final Painting for Unit # 2 of 2x500 MW set
20.05.2009 313,974,140 completed
Gujarat State Energy Generation Ltd., Near Hazira,Village Mora, Dist. Surat , Gujarat .
Erection, Testing, Commissioning,Final Painting and Handing over of 1 x 292 TPH HRSG and its auxiliaries, Steel Stack, Piping etc, for 1x350 MW combined Power Plant at GSEG, Hazira ,Dist. Surat, Gujarat
18.03.2009 82,034,029 completed
National Thermal Power Corporation / Korba super Thermal Power Station Korba, Chattisgarh .
Erection, Testing, Commissioning and handing over of complete Power cycle Piping including P-91 Material Piping etc, for Unit # 7 Stage III of 1 X 500 MW at Korba Super Thermal Power Station,
NTPC, Korba ,Chattisgarh.
05.01.2009 87,010,170 Completed
Kakatiya Thermal, Power Project, Bhoopalapalli, Warrangal, Andhra Pradesh.
Erection, Testing and Commissioning of Power Cycle Piping of Unit 1x500 MW Boiler
02.06.2008 9,87,81,800 completed
National Thermal Power Corporation / Korba Super Thermal Power Station , Chattisgarh.
Erection, Testing & Commissioning of Boiler and its auxiliaries, Rotating Machines including Mills and Fans, Duct, Fuel Piping etc., for Unit 7 of 1x 500 MW.
19.02.2007 172,493,240 Completed
Andhra Pradesh Power Generation Corporation Limited/Kakatiya Thermal Power Project, Warangal Andhra Pradesh.
Erection, Testing & Commissioning of Boiler Structures, Pressure Parts, Boiler Auxiliaries, Electrostatic Precipitator, Rotating Machines and supply and application of final Painting for Unit 1 of 1 x 500 MW
05.02.2007 22,94,63,960 Completed
Karnataka Power Corporation Limited / Bellary Thermal Power Project, Karnataka.
Erection, Testing & Commissioning of HP/ Power cycle Piping for SG and TG and supply and application of Painting for Unit 1 of 1x 500 MW set.
15.08.2006 39,154,140 03.11.2008
National Thermal Power Corporation / Kahalgaon Super Thermal Power Project, Bihar .
Erection, testing & commissioning of Electrostatic Precipitator for Unit No. 5 of 1 x 500 MW.
22.12.2004 43,486,652 01.08.2008
Karnataka Power Corporation Limited / Bellary Thermal Power Project, Karnataka
Erection, Testing and Commissioning of Structures, Pressure Parts, Non-Pressure Parts, Air Pre-heaters, Ducts including final Painting of Boiler for 1x 500 MW .
04.09.2004 115,530,632 03.11.2008
National Thermal PowerCorporation / Kahalgaon Super Thermal Power Project, Bihar .
Erection, Testing & Commissioning of Boiler and its auxiliaries including Rotating Machinieries, Ducts & Fuel Oil Piping etc. of 500 MW for Unit 6 of 3x500 MW.  
21.06.2004 211,815,100 Completed
National Thermal Power Corporation / Korba Super Thermal Power Station, Chatisgarh .
Economiser Bank Replacement and Associated jobs in Unit-6 Boiler & Reclamation of Economiser Coil in Boiler pressure parts of 500 MW
25.03.2004 5,509,786 Completed
Tamilnadu Electricity Board / Kuttalam Mayiladuthurai Taluk Tamilnadu.
Erection, Testing & Commissioning, application of Insulation of Heat Recovery Steam Generator and its auxiliaries, Piping of 101 MW Combined Cycle Power Plant.
03.01.2003 12,839,650 16.07.2004
Aditya Cement / Shambhupura Dist. Chittorgarh Rajasthan .
Erection, Testing & Commissioning of 1x105 TPH AFBC Boiler and its Auxiliaries including Electrostatic Precipitator and 1x23 MW Steam
Generator and its Auxiliaries and Piping etc.
16.03.2002 13,618,098 Completed
National Thermal Power Corporation / Talcher Super thermal Power Project,Orissa
Erection, Testing & Commissioning of Boiler for Stage II Unit-V of 4 x 500 MW .
06.08.2001 112,440,704 Completed
Hasdeo Thermal Power Station, CS Electricity Board, Korba West.
Overhauling of coal mills, raw coal feeders, coal bunkers, cleaning & servicing of Mill lube oil system, servicing of Mill gear box, Nitrogen Panels etc. of 2x210 MW boilers of unit no.3 & 4 .
16.06.2001 27,40,175 Completed
Hasdeo Thermal Power Station, CS Electricity Board, Korba West.
Overhauling of ID, FD & PA fans of 2x210 MW ABL make boilers of Unit 3 & 4 .
02.06.2001 4,58,640 Completed
Korba Super Thermal Power Station, NTPC, Korba.
Repair of boiler tubes and overhauling of soot blowers .
12.03.2001 10,34,550 15.12.2000
Korba Super Thermal Power Station, NTPC, Korba.
Lowering of LTSH and other associated jobs in Unit VI,500 MW boiler .
12.06.2000 15,04,000 15.12.2000
Haryana State Electricity Board / Faridabad Combined Power Plant, Haryana.
Erection, testing & commissioning, trail operation & handling over of 2x230 TPH HRSGs .
15.04.1999 5,69,48,700 15.12.2000
Haryana State Electricity Board / Panipat Thermal Power station,Haryana
Erection, testing, commissioning and 1x210 MW Unit VI Boiler and Electrostatic Precipitator - Part-A and Part-B
24.08.1998 69,616,020 15.01.2002
Uttarpradesh Electricity Board / Feroze Gandhi Thermal Power station Unchahar,Rai-bareily. U.P.
Erection, testing, commissioning & trial run of 2 x 210 MW boiler, auxiliaries.
21.01.1997 31,920,000 03.05.2000
Hindustan Newsprints Limited / Kottayam Kerala .
Erection, testing & commissioning of 1x140 TPD chemical recovery boiler.
04.11.1996 7,802,020 30.09.1998
Gujarat Electricity Board/ Wanakbori Thermal Power station, Gujarat .
Erection, testing & commissioning of 1x210 MW boiler, piping, Electrostatic Precipitator and their auxiliaries.
17.06.1996 63,855,700 29.02.2000
Madras Refineries Ltd., Manli, Madras .
Erection, Testing and commissioning of 2x20 MW TG Sets and Auxiliaries.
02.09.1993 37,50,000 Completed
Cochin Refineries Ltd., Cochin, Kerala .
Fabrication & Erection of Piping & Equipments for Capacity Expansion Projects at CRL, Kerala.
06.04.1993 1,36,00,000 Completed
Dahanu Thermal Power Project, Maharashtra, BSES, Mumbai Ltd.
Erection, testing, commissioning & completion of trial operation of Electrostatic Precipitators for 2 x 250 MW Boiler
17.04.1992 2,49,31,800 Completed
Talcher Super Thermal Power Project, Kaniha, NTPC.
Erection, testing, commissioning & completion of trial operation of complete non-pressure parts like external structures, flue gas ducts, dampers, expansion joints in Unit I & II of 2 x 500 MW Boiler
10.04.1992 1,36,62,500 Completed
Talchar Super Thermal Power Project, Kaniha, NTPC.
Handling at Site Stories / Storage Yard, Transportation to Site of Work, pre-assembly, erection, testing, commissioning & completion of trial operation of rotating machines and its auxiliaries for Unit I of 2x500 MW Boiler
10.02.1992 47,63,920 Completed
National Aluminium company / Angul, Orissa.
Erection, testing, commissioning and completion of trial operation of Electrostatic Precipitator and its auxiliaries rotating equipment of Unit of VI Nalco CPP
04.10.1991 3,867,500 10.12.1994
Tamilnadu Electricity Board / North Madras Thermal Power Project, Tamilnadu
Erection, testing and completion of trial opertion of Electrostatic Precipitators and its auxiliaries rotating equipment, ducts, dampers for the first two units of 2 x 210 MW .
06.03.1991 11,578,500 31.10.1995
Engineers India Limited / Cochin Refineries Ltd., Kerala.
Erection, testing & commissioning of 1 x 60 T/H Heat Recovery Steam Generator including insulation for Cochin Refineries Ltd.
14.03.1990 3,907,750 15.04.1991
National Thermal Power Corporation / Korba Super Thermal Power Project, Chhattisgarh,
Chatisgarh
EErection, testing & commissioning of mills, fans & other auxiliaries & fuel piping of Unit VI of 3 x 500 MW.
09.03.1988 3,476,295 24.02.1990
National Thermal Power Corporation / Ramagundam Super Thermal Power Station, Andhra Pradesh
Erection, testing & commissioning of Electrostatic Precipitator galleries & stairways of Unit VI of 3 x 500 MW
20.11.1987 4,865,000 24.10.1990
Sathavahena ISPAT Ltd. Haresamudram Village, Anantapur, A.P.
Unloading, stacking, transportation, erection, testing & commissioning of 1 x15 TPH BF gas fired boiler.
20.09.1987 53,44,400 24.10.1990
Tamil Nadu Electricity Board / Mettur Thermal Power Project, Mettur, Tamilnadu
Erection, testing & commissioning of Electrostatic Precipitator, rotating equipment, ducts & dampers for Unit I, II & IV of 2 x 210 MW
12.09.1984 10,932,916 25.06.1986
 
 