Texcel had a humble beginning 30 years ago by Mr.M.P.Sudhakaran with a vision to identify the power and construction sectors as central to nation building. Ever since, Texcel has an impeccable track record. Initially operating as a Sole Proprietor company, Texcel Engineers was incorporated as a Pvt. Ltd Company in 1987.
A board of directors of eminent personalities known for their education, enlightenment and integrity with Mr. M.P. Sudhakaran leading the ambitious team of Mrs. Jayanthi Sudhakaran, Mr. M S Abhilash and Mr. Jiji Sukumar taking Texcel forward into the future. The lean and thin nature of the organization has made Texcel both cost effective and flexible.
A Multi-Product, multi-discipline company well-entrenched in erection, testing and commissioning of thermal power stations, Oil Refineries, Steel Plants, Fertilizer Plants and other major engineering projects, Texcel has emerged as a major player in the power sector.
Vision
Technical excellence, innovativeness and adaptability to an ever-changing industrial scenario.
Mission
To play an active role in infrastructure development, especially in the energy sector.
|
|
Corporate Social Responsibility
As a conscious corporate citizen, we are gearing up to our social responsibilities.
|
|
|
 |
|
 |
|
Patratu Thermal Power Station UNIT#2 3x800MW Patratu STPP,Jharkhand.(Boiler / Bunker).
|
Erection, Testing and assistance for commissioning & Trial Operation including application of Insulation, Refractory, supply & touch-up painting of Boiler & auxiliaries, Bunker package at UNIT#2 at 3X800 MW PVUNL PROJECT Patratu. |
North Chennai Thermal Power project 1x800MW North Chennai, Tamil Nadu.(STG)
|
Handling of Materials at BHEL/Client’s Stores/Storage Yard in one or more location outside plant premises and transportation to site of Erection, Erection, Testing & Assistance for commissioning and Trial Operation including supply and application of final painting of Steam Turbine, Turbo Generator & its auxiliaries including BOIs etc., at 1 x 800 MW North Chennai TPS Stage III
|
Doosan Power System India Private Ltd. 2x660MW Jawaharpur, Uttar Pradesh.
|
Erection, Testing, Commissioning and handing over of Unit #1 & 2 Boiler, Power Cycle Piping package of 2x660MW Jawaharpur Super Thermal Power Station, Uttar Pradesh.
|
Ennore SEZ Thermal power project (boiler) unit-1 2x660MW,Chennal, Tamil Nadu
|
Erection, Testing, Commissioning of Ennore SEZ Thermal power project (boiler) unit-1 2x660MW,Chennal, Tamil Nadu
|
Gujrat State Electricity Corporation(FPS) 1x800MW Wanakbori, Gujrat
|
Handling at site stores / storage yard, transporting to site inspection, pre-assembly, erection, alignment, welding, NDT, fixing of hangers & Supports, water flushing, hydro testing, surface finish, supply & application of primer & Finish paints, Wrapping & coating including labeling & Flow direction on the equipment’s, piping & hangers and Supports, pre-commissioning, commissioning, trial operation & handing over to customer for piping of Fire Protection System and Fire Water Pump house Equipment etc. 1x800MW, Wanakbori TPS Unit#8
|
|
|
|
 |
|
 |
|
|
 |
|
 |
|